01
Mark the wall
Choose a clean working height and mark level mounting points.
Install
01
Choose a clean working height and mark level mounting points.
02
Fasten into studs, blocking, masonry, or approved structural backing.
03
Place rolls by shade, brand, or workflow priority.
04
Keep film identification visible so installers move faster.
Need a printable guide for your installer or shop team? Use the technical document before drilling.
View Technical Document